ITS Service Status Report

Scheduled Maintenance — Resolved

In-building Networks, Electric High Voltage Substation - BIRB

Start Time: 07/20/2017 9:00 am

Maintenance Completed: 07/20/2017 5:00 pm

Asset(s): Asset Tag Asset Description Asset Location Work Location Areas & Other Assets Affected Proposed Time The Primary Systems Group would like to schedule the 5 year preventative maintenance to the substation at BONISTEEL INTERDISCIPLINARY RESEARCH BUILDING-402 serving MODULAR MRI BUILDING-5348, Bentley Stacks located at Bonisteel on Thursday 7/20/17 from 9am to 5pm . This shutdown is to perform the 5 year preventative maintenance to the Substation. This maintenance is required to be performed every five years and will result in a total power outage The buildings should not be occupied during this time due to lighting, ventilation, networking, elevator, and life safety system service interruptions. All sensitive electronic equipment should be turned off or unplugged. You may want to empty any refrigerators prior to this date. This shutdown will affect the following equipment the Bentley Stack Alarms and Elevators located in Bonisteel. -

Issue Symptoms: Outage

Technical Details

Service Type: Production

Comments:
Substation maintenance is complete

Report Additional Impacts