ITS Service Status Report

Unscheduled Outage — Resolved

In-building Networks

Start Time: 10/23/2009 6:45 pm

Service Restored: 10/24/2009 8:00 am

Many buildings on North campus have been experiencing a power outage starting at about 6:45 PM. The cause of the outage is unknown but it is likely weather related. The following buildings are affected, there may be more.

Bursley Residence
Baits Residence
SI North and annex
Walgreen Drama Center
UM Transportation Research Institute
Art & Architecture
Northwood Family Housing
Pierpont Commons
Music
North Campus Grounds Services
Bentley Library

Technical Details

Service Type: Production

Comments:
As of about 9:30 PM, estimated time to repair will be 5-6 more hours.

Power was restored to most locations by about 3:00 AM. A few devices were down longer. A UPS failed at SI North and power was restored at about 6:30. A distribution switch failed at Art & Architecture and service was restored at about 8:00.