In-building Networks, Naval Architecture and Marine Engineering - WiFi Upgrade

Scheduled Maintenance

Start Time: 06/26/2017 5:00 am

Anticipated End Time: 06/30/2017 5:00 pm

UMnet will be upgrading the wireless at Naval Architecture and Marine Engineering. There will be brief rolling outages and/or degradation in WiFi service throughout the building as access points are moved and replaced.

In-building Networks, WIFI Upgrade COOLEY MORTIMER E MEMORIAL building

Scheduled Maintenance

Start Time: 06/26/2017 6:00 am

Anticipated End Time: 06/29/2017 3:00 pm

Users will experience intermittent wireless connections during the upgrade.

In-building Networks, Northwoods II electrical mtce June 26 7a-2p

Scheduled Maintenance

Start Time: 06/26/2017 7:00 am

Anticipated End Time: 06/26/2017 2:00 pm

Northwoods II will lose all electricity. Apartments and Service buildings are vacant. ITS networks wired and wireless will be down during this short electrical maintenance from 0700-1400 26June2017.

Data Center Services, LSA Room 0262

Scheduled Maintenance

Start Time: 06/26/2017 9:00 am

Anticipated End Time: 06/26/2017 11:00 am

None

In-building Networks, Routine Fiber Maintenance

Scheduled Maintenance

Start Time: 06/27/2017 5:00 am

Anticipated End Time: 06/27/2017 8:00 am

This work should have no impact on any network related services.

In-building Networks, UPS Replacement @ Plant Service Building 2nd Floor

Scheduled Maintenance

Start Time: 06/27/2017 5:00 am

Anticipated End Time: 06/27/2017 8:00 am

A failing UPS will be replaced at Plant Service Building 2nd Floor on Tuesday June 27th between 05:00 and 08:00. Any potential outage will be less than 5 minutes during the above window.

In-building Networks

Scheduled Maintenance

Start Time: 06/27/2017 5:00 am

Anticipated End Time: 06/27/2017 7:00 am

3rd floor UPS replacement Rm. 3664

Update Configuration on Switch at ASBDC

Scheduled Maintenance

Start Time: 06/27/2017 5:00 am

Anticipated End Time: 06/27/2017 7:00 am

The configuration work is minor with a network disruption of less than 1 second.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 06/28/2017 3:00 pm

Anticipated End Time: 06/28/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

None

Scheduled Maintenance

Start Time: 06/28/2017 3:00 pm

Anticipated End Time: 06/28/2017 6:00 pm

This change should be completely invisible to all hosts. During the scheduled quarterly production and non-production patching of miserver linux hosts, the DNS service will be reconfigured to make use of the new DNS resolvers for...

Voice Services, Vistapoint Operator Console

Scheduled Maintenance

Start Time: 06/28/2017 5:00 pm

Anticipated End Time: 06/28/2017 6:00 pm

The Operator Console will be upgraded for support and security purposes. During this maintenance window the Operator Console will be down.

Human Resources Application Service

Scheduled Maintenance

Start Time: 06/29/2017 9:00 am

Anticipated End Time: 06/30/2017 5:00 pm

HCMQA92 will have its data refreshed June 29-30. During the refresh HCMQA92 will be unavailable.

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/29/2017 6:30 pm

Anticipated End Time: 06/29/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/29/2017 6:30 pm

Anticipated End Time: 06/29/2017 8:30 pm

routine software updates, no anticipated impacts

Research Administration Application Service

Scheduled Maintenance

Start Time: 06/30/2017 12:00 am

Anticipated End Time: 07/01/2017 5:00 pm

M-Inform will be unavailable beginning at 12:01 AM on Friday, June 30 through approximately 5:00 PM on Saturday, July 1 to prepare for the annual disclosure process. The business owners have been informed.

MiWorkspace

Scheduled Maintenance

Start Time: 06/30/2017 8:30 am

Anticipated End Time: 06/30/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/30/2017 8:30 am

Anticipated End Time: 06/30/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace, Campus Computing Sites

Scheduled Maintenance

Start Time: 06/30/2017 11:00 pm

Anticipated End Time: 07/01/2017 7:00 am

The MiWorkspace and Campus Computing Sites printing services will be down while the PaperCut application is upgraded to version 17.0.7 Card reader authentication and Follow-Me job release will be unavailable. During this outage, Sites...

Voice Services, Ann Arbor IP Contact Center

Scheduled Maintenance

Start Time: 07/01/2017 7:30 am

Anticipated End Time: 07/01/2017 8:30 am

We will be applying new licensees to the Ann Arbor contact center servers. There should be no degradation, but if services need to be restarted 24/7 contact centers will be notified. Dearborn and Flint will not be affected.

Install SCBE2/SF2, Software Upgrade, and HD Replacement on r-SEB

Scheduled Maintenance

Start Time: 07/01/2017 11:00 pm

Anticipated End Time: 07/02/2017 3:00 am

A network disruption up to 30 seconds is expected due to this maintenance.

BlueCat switch to virtual server

Scheduled Maintenance

Start Time: 07/01/2017 11:00 pm

Anticipated End Time: 07/02/2017 3:00 am

The main BlueCat server is moving from an old model 5500 physical server to a new model 6000 virtual server. DNS and DHCP will not be interrupted, but the proteus1.umnet.umich.edu web interface to make changes will be down during this...

Vacuum and reindex BlueCat database

Scheduled Maintenance

Start Time: 07/01/2017 11:00 pm

Anticipated End Time: 07/02/2017 1:00 am

Stopping BlueCat web interface to perform a database vacuum and reindex. Reboot server if needed to reduce memory use. No outage to DNS and DHCP services. Call Bob Harold at 734-512-7038 if this is a problem for you or you need to make...

MiWorkspace

Scheduled Maintenance

Start Time: 07/06/2017 6:30 pm

Anticipated End Time: 07/06/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/06/2017 6:30 pm

Anticipated End Time: 07/06/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/07/2017 8:30 am

Anticipated End Time: 07/07/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/07/2017 8:30 am

Anticipated End Time: 07/07/2017 10:30 am

Routine Software Updates, no anticipated impact

Electrical

Scheduled Maintenance

Start Time: 07/08/2017 7:00 am

Anticipated End Time: 07/08/2017 5:00 pm

Primary Building: 00181-HATCHER HARLAN H SOUTH GRADUATE LIBRARY Other Affected Building(s): 00151-ALUMNI MEMORIAL HALL, 00159-CLEMENTS WILLIAM L LIBRARY, 00185-HATCHER H NORTH GRADUATE LIBRARY, 00203-PRESIDENTS RESIDENCE, 00227-SHAPIRO...

Data Center Services

Scheduled Maintenance

Start Time: 07/08/2017 8:00 am

Anticipated End Time: 07/08/2017 4:00 pm

The expected impact for this maintenance is minimal (seconds) as systems are migrated to the new distribution layer (DL) routers.

Identity and Access Management Application Services

Scheduled Maintenance

Start Time: 07/08/2017 11:00 pm

Anticipated End Time: 07/09/2017 11:00 pm

On Saturday, 8 July 2017, the Identity and Access Management team will implement identity and access management information within the Microsoft Azure cloud service. This activity will provide Azure with user and group information from...

BlueCat Address Manager (Proteus) software update to 8.2.0

Scheduled Maintenance

Start Time: 07/08/2017 11:00 pm

Anticipated End Time: 07/09/2017 7:00 am

BlueCat https://proteus1.umnet.umich.edu will be unavailable for 4 to 8 hours while the software is updated from v8.0.0 to 8.2.0. So no changes to central DNS or DHCP can be made during this time. Call my cell at 734-512-7038 if there is...

Learning Management, MiStorage NFS

Scheduled Maintenance

Start Time: 07/09/2017 4:00 am

Anticipated End Time: 07/09/2017 7:00 am

Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS aliases are updated. Application team will shutdown app. Sys Support Unix will unmount current shares. ITS Storage team...

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/13/2017 6:30 pm

Anticipated End Time: 07/13/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/13/2017 6:30 pm

Anticipated End Time: 07/13/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/14/2017 8:30 am

Anticipated End Time: 07/14/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/14/2017 8:30 am

Anticipated End Time: 07/14/2017 10:30 am

Routine Software Updates, no anticipated impact

MiServer

Scheduled Maintenance

Start Time: 07/14/2017 8:00 pm

Anticipated End Time: 07/16/2017 8:00 am

The MiServer Support Team will be upgrading the ESXi hosts supporting your vServers in the MiServer environment starting Friday 7/14 at 8 pm and finishing by 7/16 at 8am. Keeping ESXi versions current allows us to support the latest...

MiStorage CIFS

Scheduled Maintenance

Start Time: 07/15/2017 11:00 pm

Anticipated End Time: 07/16/2017 6:00 am

Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS aliases are updated. It is recommended that shares be unmounted before maintenance and remounted when maintenance is...

BlueCat 8.2.0 upgrade to the remaining DNS and DHCP servers

Scheduled Maintenance

Start Time: 07/15/2017 11:00 pm

Anticipated End Time: 07/16/2017 3:00 am

Upgrade the remaining BlueCat DNS and DHCP servers from 8.0.0 to 8.2.0. Since the servers are in redundant pairs, there should be no outage. Adonis1 and 2 are scheduled the week before. The remaining servers are:...

Data Center Services, Install SCBE2/SF2 on r-MACC-C and r-MACC-D

Scheduled Maintenance

Start Time: 07/16/2017 5:00 am

Anticipated End Time: 07/16/2017 7:00 am

A network disruption up to 30 seconds is expected due to this maintenance.

MiServer

Scheduled Maintenance

Start Time: 07/19/2017 9:00 am

Anticipated End Time: 07/24/2017 9:00 am

This is a note to inform you of upcoming quarterly maintenance for non-production managed Windows hosts. This launch of Windows quarterly maintenance will focus on the backup client "IBM Spectrum Protect" (A.K.A.: Tivoli Storage Manager)...

In-building Networks, Electric High Voltage Substation - BIRB

Scheduled Maintenance

Start Time: 07/20/2017 9:00 am

Anticipated End Time: 07/20/2017 5:00 pm

Asset(s): Asset Tag Asset Description Asset Location Work Location Areas & Other Assets Affected Proposed Time The Primary Systems Group would like to schedule the 5 year preventative maintenance to the substation at BONISTEEL...

MiWorkspace

Scheduled Maintenance

Start Time: 07/20/2017 6:30 pm

Anticipated End Time: 07/20/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/20/2017 6:30 pm

Anticipated End Time: 07/20/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/21/2017 8:30 am

Anticipated End Time: 07/21/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/21/2017 8:30 am

Anticipated End Time: 07/21/2017 10:30 am

Routine Software Updates, no anticipated impact

Vacuum and reindex BlueCat database

Scheduled Maintenance

Start Time: 07/22/2017 11:00 pm

Anticipated End Time: 07/23/2017 3:00 am

Stopping BlueCat web interface to perform a database vacuum and reindex. Reboot server if needed to reduce memory use. No outage to DNS and DHCP services. Call Bob Harold at 734-512-7038 if this is a problem for you or you need to make...

MiStorage CIFS

Scheduled Maintenance

Start Time: 07/22/2017 11:00 pm

Anticipated End Time: 07/23/2017 6:00 am

Prior version of this listed the incorrect data of 6/3. This work for this shares is occurring on 7/22, not 6/3. -- Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS...

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/27/2017 6:30 pm

Anticipated End Time: 07/27/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/27/2017 6:30 pm

Anticipated End Time: 07/27/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/28/2017 8:30 am

Anticipated End Time: 07/28/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/28/2017 8:30 am

Anticipated End Time: 07/28/2017 10:30 am

Routine Software Updates, no anticipated impact

Data Center Services, MDC Data Center Network

Scheduled Maintenance

Start Time: 07/29/2017 7:15 am

Anticipated End Time: 07/29/2017 9:30 am

The work is occurring during a scheduled power maintenance at the MDC data center. No additional downtime will occur for the MDC data center due to this effort.

None

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: 07/30/2017 3:00 am

This change should be completely invisible to all hosts. During the scheduled quarterly production and non-production patching of miserver linux hosts, the DNS service will be reconfigured to make use of the new DNS resolvers for...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: 07/30/2017 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

MiStorage CIFS

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: Unknown

Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS aliases are updated. It is recommended that shares be unmounted before maintenance and remounted when maintenance is...

Backbone, r-BIN-SEB - SCBE2/SF2 Installation - Attn: HITS Network

Scheduled Maintenance

Start Time: 07/30/2017 2:00 am

Anticipated End Time: 07/30/2017 5:00 am

Impact to internet traffic is 30 seconds.

MiWorkspace

Scheduled Maintenance

Start Time: 08/03/2017 6:30 pm

Anticipated End Time: 08/03/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/03/2017 6:30 pm

Anticipated End Time: 08/03/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/04/2017 8:30 am

Anticipated End Time: 08/04/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/04/2017 8:30 am

Anticipated End Time: 08/04/2017 10:30 am

Routine Software Updates, no anticipated impact

Upgrade MACC Data Center Firewall Software

Scheduled Maintenance

Start Time: 08/06/2017 6:00 am

Anticipated End Time: 08/06/2017 7:00 am

No outage is expected with this maintenance as network traffic and protection will fail over to the standby firewall during the maintenance.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/10/2017 6:30 pm

Anticipated End Time: 08/10/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/10/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/11/2017 8:30 am

Anticipated End Time: 08/11/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/11/2017 8:30 am

Anticipated End Time: 08/11/2017 10:30 am

Routine Software Updates, no anticipated impact

Backbone, r-BIN-ARBL - SCBE2/SF2 Installation - Attn: HITS Network

Scheduled Maintenance

Start Time: 08/13/2017 5:00 am

Anticipated End Time: 08/13/2017 7:00 am

Impact to internet traffic is 30 seconds.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/17/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/17/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/18/2017 8:30 am

Anticipated End Time: 08/18/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/18/2017 8:30 am

Anticipated End Time: 08/18/2017 10:30 am

Routine Software Updates, no anticipated impact

MiServer

Scheduled Maintenance

Start Time: 08/23/2017 9:00 am

Anticipated End Time: 08/28/2017 9:00 am

This is a note to inform you of upcoming quarterly maintenance for production managed Windows hosts. This launch of Windows quarterly maintenance will focus on the backup client "IBM Spectrum Protect" (A.K.A.: Tivoli Storage Manager) and...

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 08/23/2017 3:00 pm

Anticipated End Time: 08/23/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

MiWorkspace

Scheduled Maintenance

Start Time: 08/24/2017 6:00 pm

Anticipated End Time: 08/24/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/24/2017 6:30 pm

Anticipated End Time: 08/24/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/25/2017 8:30 am

Anticipated End Time: 08/25/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/25/2017 8:30 am

Anticipated End Time: 08/25/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/31/2017 6:30 pm

Anticipated End Time: 08/31/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/31/2017 6:30 pm

Anticipated End Time: 08/31/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/01/2017 8:30 am

Anticipated End Time: 09/01/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/01/2017 8:30 am

Anticipated End Time: 09/01/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 09/07/2017 6:30 pm

Anticipated End Time: 09/07/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/07/2017 6:30 pm

Anticipated End Time: 09/07/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/14/2017 6:30 pm

Anticipated End Time: 09/14/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/14/2017 6:30 pm

Anticipated End Time: 09/14/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/21/2017 6:30 pm

Anticipated End Time: 09/21/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/21/2017 6:30 pm

Anticipated End Time: 09/21/2017 8:30 pm

routine software updates, no anticipated impacts

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 09/23/2017 11:00 pm

Anticipated End Time: 09/24/2017 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

Learning Management

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

During the CSPROD Bundle Release maintenance on October 7th (http://status.its.umich.edu/report.php?id=127640), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also be...

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

CSPROD will be down from 11:00pm on 10/07/17 through 7:00am on 10/08/17.

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/18/2017 12:00 pm

Anticipated End Time: 10/20/2017 5:00 pm

CSQA9 will be down for a refresh of data from CSPROD. Users will be unable to access CSQA9 during the outage.

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/27/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/26/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

Student Administration Application Service

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

CSPROD will be down from 11:00pm on 12/02/17 through 7:00am on 12/03/17.

Learning Management

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

During the CSPROD Bundle Release maintenance on December 2nd (http://status.its.umich.edu/report.php?id=127660), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also...

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 12/06/2017 3:00 pm

Anticipated End Time: 12/06/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 01/13/2018 11:00 pm

Anticipated End Time: 01/14/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 03/07/2018 3:00 pm

Anticipated End Time: 03/07/2018 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 04/07/2018 11:00 pm

Anticipated End Time: 04/08/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Analytics and BI, Financial Application Service, Human Resources Application Service, Identity and Access Management Application Services, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 05/17/2018 5:00 pm

Anticipated End Time: 05/21/2018 6:00 am

Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required to maintain compliance...

Financial Application Service, Human Resources Application Service, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 06/07/2018 5:00 pm

Anticipated End Time: 06/11/2018 6:00 am

Contingency Window: Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required...