Upcoming Maintenance RSS

In-building Networks, Replace s-chem-4707a-1 10.233.23.14

Scheduled Maintenance

Start Time: 05/30/2017 5:00 am

Anticipated End Time: 05/30/2017 7:00 am

Users will experience a network outage during the replacement of the switch.

Network IPS-CHEME-DOW aka 141.212.142.0/23 Network Maintenance

Scheduled Maintenance

Start Time: 05/30/2017 6:00 am

Anticipated End Time: 05/30/2017 6:30 am

Users will experience a brief network outage while the routing is transitioned from the core routers (r-COOL & r-FXB) to the local building router (d-DOW-1).

Power Outage

Scheduled Maintenance

Start Time: 05/30/2017 7:30 am

Anticipated End Time: 05/30/2017 8:00 am

This shutdown will affect RP-4557C serving fume hood 4562, receptacles lab 4546, vacuum pump 4562, receptacles lab 4550, chromotography 4562, Dryer 4546, receptacles 4562, vacuum pump 4546, fume hood 4546, Dryer 4550, Vacuum pump 4550,...

Baits II Electrical maint: 9am 30May - 3:30pm 01Jun

Scheduled Maintenance

Start Time: 05/30/2017 9:00 am

Anticipated End Time: 06/01/2017 3:30 pm

Baits II dorm will lose all electricity for 3 days. No networks, lights, cooling, or fire alarms will be working. Buildings will not be occupied. Electrical high voltage maintenance will be performed.

Development / Alumni Application Service

Scheduled Maintenance

Start Time: 05/31/2017 5:00 am

Anticipated End Time: 05/31/2017 8:00 am

The address validation service may be unavailable for a few minutes while it is updated but there will be no other impact.

In-building Networks, Markley 10G Link Upgrade

Scheduled Maintenance

Start Time: 05/31/2017 5:00 am

Anticipated End Time: 05/31/2017 8:00 am

There will be a brief interruption to network related services in Markley during the upgrade.

Backbone

Scheduled Maintenance

Start Time: 05/31/2017 8:00 am

Anticipated End Time: 05/31/2017 9:30 am

We will be updating the campus UMVPNs configurations to use the new campus DNS server ips. This includes the following VPNs: UMVPN1 UMVPN2 UMVPN4 UMVPN5 UMVPN6 UMVPN7 UMVPN8

Cable Television, Xfinity on Campus IP TV service

Scheduled Maintenance

Start Time: 06/01/2017 12:00 am

Anticipated End Time: 06/01/2017 6:00 am

End-users will experience rolling content outages on UMTV and Xfinity On-Campus during the maintenance window

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/01/2017 6:30 pm

Anticipated End Time: 06/01/2017 8:30 pm

Routine Software Updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/01/2017 6:30 pm

Anticipated End Time: 06/01/2017 8:30 pm

Routine Software Updates, no anticipated impacts

Voice Services

Scheduled Maintenance

Start Time: 06/01/2017 10:00 pm

Anticipated End Time: 06/02/2017 2:00 am

We will be applying a patch to the Legacy Voice Telephone System. We do not anticipate any impact to the Users.

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/02/2017 8:30 am

Anticipated End Time: 06/02/2017 10:30 am

Routine Software Updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/02/2017 8:30 am

Anticipated End Time: 06/02/2017 10:30 am

10891 Windows Management Framework Sites Core [rpfeiffe] 10940 MWS SysHealth Check 1.7.1 [rpfeiffe] 11427 Sassafras KeyAccess Client - Sites 7.4.0.8 Sites Core [nmilety] 11667 Prism 7.03.207 Sites Course [nmilety] 11688 Stata SE 14...

Electrical Shutdown / Power

Scheduled Maintenance

Start Time: 06/03/2017 7:00 am

Anticipated End Time: 06/03/2017 3:30 pm

Primary Building: 00510-BAITS VERA I EATON HOUSE Other Affected Building(s): 00511-BAITS VERA I LEE HOUSE, 00512-BAITS VERA I PARKER HOUSE, 00513-BAITS VERA I SMITH HOUSE, 00514-BAITS VERA I STANLEY HOUSE This shutdown is to perform...

Voice Services, Unified Communications - Ann Arbor VoIP Cluster Minor Maintenance

Scheduled Maintenance

Start Time: 06/03/2017 8:00 am

Anticipated End Time: 06/03/2017 10:00 am

Change authentication URL in A2 primary cluster Reset all phones in A2 Dearborn and Flint are NOT affected by this change. These changes are scheduled to be made after hours to avoid disruption to users. We will notify 24x7 contact...

IP Video Conferencing Services - Endpoint maintenance

Scheduled Maintenance

Start Time: 06/03/2017 8:00 am

Anticipated End Time: 06/03/2017 12:00 pm

1.) Select ITS managed video conferencing endpoints will be rebooted after security patch is applied. Reboot time takes approx 2-3 minutes. 2.) We will also be migrating select endpoints to a different call processing cluster, at which...

Financial Application Service, ITS IP Fax server patching (inbound server only)

Scheduled Maintenance

Start Time: 06/03/2017 8:00 am

Anticipated End Time: 06/03/2017 9:00 am

We plan to apply patches to our fax servers. The patching is expected to take less than 30 minutes. The server will be rebooted during this maintenance window.

Desktop Backup

Scheduled Maintenance

Start Time: 06/03/2017 9:00 am

Anticipated End Time: 06/03/2017 12:00 pm

Code42 has scheduled maintenance for the Code42 public cloud for three hours starting at 8:00 a.m. Central Time (UTC/GMT-6) on Saturday, June 3. Affected Code42 Public Cloud Services The following Code42 products and services may be...

Computer Power and Patch Management, Voice Services, Unified Communications - Ann Arbor VoIP Cluster CTL file change

Scheduled Maintenance

Start Time: 06/03/2017 12:00 pm

Anticipated End Time: 06/03/2017 3:00 pm

Change CTL file from token-based to tokenless. Reset all phones in A2 Dearborn and Flint are NOT affected by this change. These changes are scheduled to be made after hours to avoid disruption to users. We will notify 24x7 contact...

Department Webpage Hosting, Drupal Hosting, Web Application Hosting

Scheduled Maintenance

Start Time: 06/03/2017 11:00 pm

Anticipated End Time: 06/04/2017 12:30 am

formula1 motocross mountainbiking rallying tractorpull bmxfreestyle chariot hoplite curling shuffleboard bowling

Data Center Services, Install SCBE2/SF2 on r-LSA

Scheduled Maintenance

Start Time: 06/03/2017 11:00 pm

Anticipated End Time: 06/04/2017 2:00 am

A network disruption up to 30 seconds is expected due to this maintenance.

Voice Services

Scheduled Maintenance

Start Time: 06/03/2017 11:00 pm

Anticipated End Time: 06/04/2017 3:00 am

We do not anticipate any impact on telephone services.

MiStorage CIFS, MiStorage NFS

Scheduled Maintenance

Start Time: 06/03/2017 11:00 pm

Anticipated End Time: 06/04/2017 2:00 am

Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS aliases are updated. It is recommended that shares be unmounted before maintenance and remounted when maintenance is...

Data Center Services, SEB

Scheduled Maintenance

Start Time: 06/03/2017 11:00 pm

Anticipated End Time: 06/04/2017 4:00 am

None

In-building Networks, School of Social Work WiFi Upgrade

Scheduled Maintenance

Start Time: 06/04/2017 7:00 am

Anticipated End Time: 06/09/2017 5:00 pm

The WiFi network at the School of Social Work is being upgraded. There will be brief rolling outages and/or degredations in WiFi service throughout the building as access points are moved and replaced.

In-building Networks, Network IPS-OVPR-MULTI aka 141.212.162.0/23 Network Maintenance

Scheduled Maintenance

Start Time: 06/06/2017 6:00 am

Anticipated End Time: 06/06/2017 6:30 am

Users will experience a brief network outage while the routing is transitioned from the core routers (r-COOL & r-FXB) to the local building router (d-MMPL-1).

DNS filtering for MWireless, using DNS RPZ

Scheduled Maintenance

Start Time: 06/08/2017 7:00 am

Anticipated End Time: 06/08/2017 8:00 am

DNS filtering will be turned on for MWireless. IIA is rolling out Domain Name Service (DNS) filtering as an additional tool to protect campus from malicious websites. DNS filtering checks websites against a list of known malware and...

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/08/2017 6:30 pm

Anticipated End Time: 06/08/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/08/2017 6:30 pm

Anticipated End Time: 06/08/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/09/2017 8:30 am

Anticipated End Time: 06/09/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/09/2017 8:30 am

Anticipated End Time: 06/09/2017 10:30 am

Routine Software Updates, no anticipated impact

Electrical Maintenance at Transport Svcs on 10June 0700-1530

Scheduled Maintenance

Start Time: 06/10/2017 7:00 am

Anticipated End Time: 06/10/2017 3:30 pm

Transportation Services Bldg will be without electricity 7a-3:30pm. The building will not be occupied; no ITS networks, lights, or life safety equipment will be working. This is 5 year planned elec maintenance.

Data Center Services, SEB

Scheduled Maintenance

Start Time: 06/10/2017 11:00 pm

Anticipated End Time: 06/11/2017 5:00 am

None

Student Administration Application Service

Scheduled Maintenance

Start Time: 06/10/2017 11:00 pm

Anticipated End Time: 06/11/2017 7:00 am

CSPROD will be down from 11:00pm on 6/10/17 through 7:00am on 6/11/17.

MiStorage CIFS, MiStorage NFS

Scheduled Maintenance

Start Time: 06/10/2017 11:00 pm

Anticipated End Time: 06/11/2017 3:00 am

Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS aliases are updated. It is recommended that shares be unmounted before maintenance and remounted when maintenance is...

Learning Management

Scheduled Maintenance

Start Time: 06/10/2017 11:00 pm

Anticipated End Time: 06/11/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 06/10/2017 11:00 pm

Anticipated End Time: 06/11/2017 7:00 am

During the CSPROD Bundle Release maintenance on June 10th (http://status.its.umich.edu/report.php?id=127620), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also be...

In-building Networks, Electric High Voltage Substation affecting MI News Bldg; Newberry Helen Residence; Barbour Betsy House; Student Activities Bldg; and Lipsey Stanford Student Pubs

Scheduled Maintenance

Start Time: 06/13/2017 6:00 pm

Anticipated End Time: 06/14/2017 2:00 am

This is notification of an electrical shutdown scheduled at the following buildings: MICHIGAN NEWS BUILDING; LIPSEY STANFORD STUDENT PUBLICATIONS BUILDING; NEWBERRY HELEN H RESIDENCE; BARBOUR BETSY HOUSE; and STUDENT ACTIVITIES...

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/15/2017 6:30 pm

Anticipated End Time: 06/15/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/15/2017 6:30 pm

Anticipated End Time: 06/15/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/16/2017 8:30 am

Anticipated End Time: 06/16/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/16/2017 8:30 am

Anticipated End Time: 06/16/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/22/2017 6:30 pm

Anticipated End Time: 06/22/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/22/2017 6:30 pm

Anticipated End Time: 06/22/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/23/2017 8:30 am

Anticipated End Time: 06/23/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/23/2017 8:30 am

Anticipated End Time: 06/23/2017 10:30 am

Routine Software Updates, no anticipated impact

Electrical

Scheduled Maintenance

Start Time: 06/24/2017 4:00 am

Anticipated End Time: 06/24/2017 11:30 am

This maintenance is required to be performed every five years and will result in a total power outage The buildings should not be occupied during this time due to lighting, ventilation, networking, elevator, and life safety system service...

Data Center Services

Scheduled Maintenance

Start Time: 06/24/2017 4:30 am

Anticipated End Time: 06/24/2017 11:30 am

No campus network outage is expected due to the LSA Building power shutdown.

Backbone, Attn: HITS Network

Scheduled Maintenance

Start Time: 06/25/2017 5:00 am

Anticipated End Time: 06/25/2017 7:00 am

Impact to internet traffic is 30 seconds.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 06/28/2017 3:00 pm

Anticipated End Time: 06/28/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

MiWorkspace

Scheduled Maintenance

Start Time: 06/29/2017 6:30 pm

Anticipated End Time: 06/29/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/29/2017 6:30 pm

Anticipated End Time: 06/29/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 06/30/2017 8:30 am

Anticipated End Time: 06/30/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 06/30/2017 8:30 am

Anticipated End Time: 06/30/2017 10:30 am

Routine Software Updates, no anticipated impact

Install SCBE2/SF2, Software Upgrade, and HD Replacement on r-SEB

Scheduled Maintenance

Start Time: 07/01/2017 11:00 pm

Anticipated End Time: 07/02/2017 3:00 am

A network disruption up to 30 seconds is expected due to this maintenance.

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/06/2017 6:30 pm

Anticipated End Time: 07/06/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/06/2017 6:30 pm

Anticipated End Time: 07/06/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/07/2017 8:30 am

Anticipated End Time: 07/07/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/07/2017 8:30 am

Anticipated End Time: 07/07/2017 10:30 am

Routine Software Updates, no anticipated impact

Electrical

Scheduled Maintenance

Start Time: 07/08/2017 7:00 am

Anticipated End Time: 07/08/2017 5:00 pm

Primary Building: 00181-HATCHER HARLAN H SOUTH GRADUATE LIBRARY Other Affected Building(s): 00151-ALUMNI MEMORIAL HALL, 00159-CLEMENTS WILLIAM L LIBRARY, 00185-HATCHER H NORTH GRADUATE LIBRARY, 00203-PRESIDENTS RESIDENCE, 00227-SHAPIRO...

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/13/2017 6:30 pm

Anticipated End Time: 07/13/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/13/2017 6:30 pm

Anticipated End Time: 07/13/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/14/2017 8:30 am

Anticipated End Time: 07/14/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/14/2017 8:30 am

Anticipated End Time: 07/14/2017 10:30 am

Routine Software Updates, no anticipated impact

Data Center Services, Install SCBE2/SF2 on r-MACC-C and r-MACC-D

Scheduled Maintenance

Start Time: 07/16/2017 5:00 am

Anticipated End Time: 07/16/2017 7:00 am

A network disruption up to 30 seconds is expected due to this maintenance.

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/20/2017 6:30 pm

Anticipated End Time: 07/20/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/20/2017 6:30 pm

Anticipated End Time: 07/20/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/21/2017 8:30 am

Anticipated End Time: 07/21/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/21/2017 8:30 am

Anticipated End Time: 07/21/2017 10:30 am

Routine Software Updates, no anticipated impact

MiStorage CIFS

Scheduled Maintenance

Start Time: 07/22/2017 11:00 pm

Anticipated End Time: 07/23/2017 6:00 am

Prior version of this listed the incorrect data of 6/3. This work for this shares is occurring on 7/22, not 6/3. -- Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS...

MiWorkspace

Scheduled Maintenance

Start Time: 07/27/2017 6:30 pm

Anticipated End Time: 07/27/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/27/2017 6:30 pm

Anticipated End Time: 07/27/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/28/2017 8:30 am

Anticipated End Time: 07/28/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 07/28/2017 8:30 am

Anticipated End Time: 07/28/2017 10:30 am

Routine Software Updates, no anticipated impact

Data Center Services, MDC Data Center Network

Scheduled Maintenance

Start Time: 07/29/2017 7:15 am

Anticipated End Time: 07/29/2017 9:30 am

The work is occurring during a scheduled power maintenance at the MDC data center. No additional downtime will occur for the MDC data center due to this effort.

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: 07/30/2017 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Backbone, Attn: HITS Network

Scheduled Maintenance

Start Time: 07/30/2017 2:00 am

Anticipated End Time: 07/30/2017 5:00 am

Impact to internet traffic is 30 seconds.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/03/2017 6:30 pm

Anticipated End Time: 08/03/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/03/2017 6:30 pm

Anticipated End Time: 08/03/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/04/2017 8:30 am

Anticipated End Time: 08/04/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/04/2017 8:30 am

Anticipated End Time: 08/04/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/10/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/10/2017 6:30 pm

Anticipated End Time: 08/10/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/11/2017 8:30 am

Anticipated End Time: 08/11/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/11/2017 8:30 am

Anticipated End Time: 08/11/2017 10:30 am

Routine Software Updates, no anticipated impact

Backbone, Attn: HITS Network

Scheduled Maintenance

Start Time: 08/13/2017 5:00 am

Anticipated End Time: 08/13/2017 7:00 am

Impact to internet traffic is 30 seconds.

MiWorkspace

Scheduled Maintenance

Start Time: 08/17/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/17/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/18/2017 8:30 am

Anticipated End Time: 08/18/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/18/2017 8:30 am

Anticipated End Time: 08/18/2017 10:30 am

Routine Software Updates, no anticipated impact

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 08/23/2017 3:00 pm

Anticipated End Time: 08/23/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

MiWorkspace

Scheduled Maintenance

Start Time: 08/24/2017 6:00 pm

Anticipated End Time: 08/24/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/24/2017 6:30 pm

Anticipated End Time: 08/24/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/25/2017 8:30 am

Anticipated End Time: 08/25/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/25/2017 8:30 am

Anticipated End Time: 08/25/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/31/2017 6:30 pm

Anticipated End Time: 08/31/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/31/2017 6:30 pm

Anticipated End Time: 08/31/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/01/2017 8:30 am

Anticipated End Time: 09/01/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 09/01/2017 8:30 am

Anticipated End Time: 09/01/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/07/2017 6:30 pm

Anticipated End Time: 09/07/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/07/2017 6:30 pm

Anticipated End Time: 09/07/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/14/2017 6:30 pm

Anticipated End Time: 09/14/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/14/2017 6:30 pm

Anticipated End Time: 09/14/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/21/2017 6:30 pm

Anticipated End Time: 09/21/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/21/2017 6:30 pm

Anticipated End Time: 09/21/2017 8:30 pm

routine software updates, no anticipated impacts

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 09/23/2017 11:00 pm

Anticipated End Time: 09/24/2017 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

Learning Management

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

During the CSPROD Bundle Release maintenance on October 7th (http://status.its.umich.edu/report.php?id=127640), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also be...

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

CSPROD will be down from 11:00pm on 10/07/17 through 7:00am on 10/08/17.

MiWorkspace

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/27/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/26/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

During the CSPROD Bundle Release maintenance on December 2nd (http://status.its.umich.edu/report.php?id=127660), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also...

Student Administration Application Service

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

CSPROD will be down from 11:00pm on 12/02/17 through 7:00am on 12/03/17.

Learning Management

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 12/06/2017 3:00 pm

Anticipated End Time: 12/06/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

MiWorkspace

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 01/13/2018 11:00 pm

Anticipated End Time: 01/14/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 03/07/2018 3:00 pm

Anticipated End Time: 03/07/2018 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 04/07/2018 11:00 pm

Anticipated End Time: 04/08/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Analytics and BI, Financial Application Service, Human Resources Application Service, Identity and Access Management Application Services, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 05/17/2018 5:00 pm

Anticipated End Time: 05/21/2018 6:00 am

Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required to maintain compliance...

Financial Application Service, Human Resources Application Service, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 06/07/2018 5:00 pm

Anticipated End Time: 06/11/2018 6:00 am

Contingency Window: Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required...

Report Additional Impacts