Upcoming Maintenance RSS

MiStorage CIFS

Scheduled Maintenance

Start Time: 07/22/2017 11:00 pm

Anticipated End Time: 07/23/2017 6:00 am

Prior version of this listed the incorrect data of 6/3. This work for this shares is occurring on 7/22, not 6/3. -- Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS...

Identity and Access Management Application Services, Active Directory

Scheduled Maintenance

Start Time: 07/22/2017 11:00 pm

Anticipated End Time: 07/23/2017 7:00 am

Two new Active Directory (AD) domain controllers will be provided on the UM-Dearborn Campus this July. This will improve redundancy across campuses and enhance Active Directory performance on the Dearborn campus. The domain controllers...

Vacuum and reindex BlueCat database

Scheduled Maintenance

Start Time: 07/22/2017 11:00 pm

Anticipated End Time: 07/23/2017 3:00 am

Stopping BlueCat web interface to perform a database vacuum and reindex. Reboot server if needed to reduce memory use. No outage to DNS and DHCP services. Call Bob Harold at 734-512-7038 if this is a problem for you or you need to make...

Switch upgrades at: Couzens, Hatcher

Scheduled Maintenance

Start Time: 07/24/2017 5:00 am

Anticipated End Time: 07/24/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Switch Upgrades at Markley

Scheduled Maintenance

Start Time: 07/25/2017 5:00 am

Anticipated End Time: 07/25/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Enable traffic on the new 100G link to Merit

Scheduled Maintenance

Start Time: 07/25/2017 5:00 am

Anticipated End Time: 07/25/2017 8:00 am

No network disruption is expected.

Switch Upgrades at School of Public Health 1, 2

Scheduled Maintenance

Start Time: 07/25/2017 5:00 am

Anticipated End Time: 07/25/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

In-building Networks, EDUCATION SCHOOL OF

Scheduled Maintenance

Start Time: 07/25/2017 5:00 am

Anticipated End Time: 07/25/2017 7:00 am

Purpose of Shutdown: To replace chiller disconnect switch for the School of Education Modify the Winter Free Cooling Project

In-building Networks, NORTHWOOD III

Scheduled Maintenance

Start Time: 07/25/2017 7:00 am

Anticipated End Time: 07/25/2017 9:00 am

Purpose of Shutdown: To replace transformer pad

In-building Networks, Merit

Scheduled Maintenance

Start Time: 07/26/2017 1:00 am

Anticipated End Time: 07/26/2017 7:00 am

Maintenance to upgrade the Milwaukee router. An outage of 20 minutes is expected

In-building Networks, Software Upgrades at NCRB, NWCC, NW3APT 507, CHEEVER, SEELEY and VANDENBURG RES HALL

Scheduled Maintenance

Start Time: 07/26/2017 5:00 am

Anticipated End Time: 07/26/2017 8:00 am

Software Upgrades at NCRB, NWCC, NW3APT 507, CHEEVER, SEELEY, and VANDENBURG RES HALL.

Switch Upgrades at: Markley, Mosher-Jordan

Scheduled Maintenance

Start Time: 07/26/2017 5:00 am

Anticipated End Time: 07/26/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

In-building Networks, Legal Research - Juniper Switch Software Updates

Scheduled Maintenance

Start Time: 07/26/2017 5:30 am

Anticipated End Time: 07/26/2017 7:00 am

UMnet will be updating the version of JUNOS running on multiple switches in Legal Research. During the updates, wired and wireless network service in the building will be unavailable. The upgrade is expected to last 30-60 minutes, but...

In-building Networks, NORTHWOOD III

Scheduled Maintenance

Start Time: 07/26/2017 7:00 am

Anticipated End Time: 07/26/2017 9:00 am

Purpose of Shutdown: To hook transformer back up after pad has been replaced

In-building Networks

Scheduled Maintenance

Start Time: 07/27/2017 5:00 am

Anticipated End Time: 07/27/2017 8:00 am

NQuad

Backbone, Core/BIN - 100G Link Reconfiguration

Scheduled Maintenance

Start Time: 07/27/2017 5:00 am

Anticipated End Time: 07/27/2017 7:00 am

UMnet and Network Engineering will re-configure multiple 100G links between Core and BIN nodes. This work will provide increased throughput between the Core and BIN while maintaining the current level of redundancy. No service impact...

Switch Upgrades at South Quad and Lacrosse Trailer

Scheduled Maintenance

Start Time: 07/27/2017 5:00 am

Anticipated End Time: 07/27/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Portfolio & Project Management, Planview

Scheduled Maintenance

Start Time: 07/27/2017 5:15 am

Anticipated End Time: 07/27/2017 7:00 am

Users will be unable to use Planview while it is being upgraded.

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/27/2017 6:30 pm

Anticipated End Time: 07/27/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 07/27/2017 6:30 pm

Anticipated End Time: 07/27/2017 8:30 pm

routine software updates, no anticipated impacts

Switch Upgrades at: South Quad, South Hall, Stockwell, Revelli

Scheduled Maintenance

Start Time: 07/28/2017 5:00 am

Anticipated End Time: 07/28/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Campus Computing Sites

Scheduled Maintenance

Start Time: 07/28/2017 8:30 am

Anticipated End Time: 07/28/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 07/28/2017 8:30 am

Anticipated End Time: 07/28/2017 10:30 am

Routine Software Updates, no anticipated impact

Data Center Services, MDC1 Ecopod

Scheduled Maintenance

Start Time: 07/29/2017 7:00 am

Anticipated End Time: 07/29/2017 7:00 pm

Complete outage of the modular data center. No services will be available.

In-building Networks, Electrical Shutdown at Pierpont Wilbur K Commons on 7/29/2017 at 07:00AM

Scheduled Maintenance

Start Time: 07/29/2017 7:00 am

Anticipated End Time: 07/29/2017 3:00 pm

This is notification of an electrical shutdown scheduled at Pierpont Wilbuer K Commons: Brief Network Outages Possible

Data Center Services, MDC Data Center Network

Scheduled Maintenance

Start Time: 07/29/2017 7:15 am

Anticipated End Time: 07/29/2017 9:30 am

The work is occurring during a scheduled power maintenance at the MDC data center. No additional downtime will occur for the MDC data center due to this effort.

Development / Alumni Application Service

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: 07/30/2017 4:00 am

The Address Accelerator may be unavailable while it is being updated on each node.

None

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: 07/30/2017 3:00 am

This change should be completely invisible to all hosts. During the scheduled quarterly production and non-production patching of miserver linux hosts, the DNS service will be reconfigured to make use of the new DNS resolvers for...

MiStorage CIFS

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: Unknown

Brief disruption as data which has been in sync is cut over from the old storage system to the new system and DNS aliases are updated. It is recommended that shares be unmounted before maintenance and remounted when maintenance is...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 07/29/2017 11:00 pm

Anticipated End Time: 07/30/2017 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Backbone, r-BIN-SEB - SCBE2/SF2 Installation - Attn: HITS Network

Scheduled Maintenance

Start Time: 07/30/2017 2:00 am

Anticipated End Time: 07/30/2017 5:00 am

Impact to internet traffic is 30 seconds.

Switch upgrades at: Duderstadt, EECS, Gerstacker, Gorguze Family Lab

Scheduled Maintenance

Start Time: 07/31/2017 5:00 am

Anticipated End Time: 07/31/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Switch upgrades at: Chrysler, Beyster, Cooley, Dow, EWRE, FXB, GG Brown

Scheduled Maintenance

Start Time: 08/01/2017 5:00 am

Anticipated End Time: 08/01/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Switch upgrades at: IOE, East Hall, Lurie Biomedical, Lurie Tower, Lurie Engineering, NAME, Space Research Bldg, Eng. Research Bldg, Pierpont Commons, Aero Lab

Scheduled Maintenance

Start Time: 08/02/2017 5:00 am

Anticipated End Time: 08/02/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Switch Upgrades at: BIRB, School of Information North, West Hall, College of Pharmacy

Scheduled Maintenance

Start Time: 08/03/2017 5:00 am

Anticipated End Time: 08/03/2017 8:00 am

This will affect all networking devices on the switches to be upgraded, including but not limited to wired devices such as desktop computers, printers, VOIP phones and wireless such as wi-fi laptops.

Enable traffic on the new 10G links to the IPS at Arbor Lakes

Scheduled Maintenance

Start Time: 08/03/2017 5:00 am

Anticipated End Time: 08/03/2017 7:00 am

No network disruption is expected.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/03/2017 6:30 pm

Anticipated End Time: 08/03/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/03/2017 6:30 pm

Anticipated End Time: 08/03/2017 8:30 pm

routine software updates, no anticipated impacts

ServiceLink

Scheduled Maintenance

Start Time: 08/03/2017 8:00 pm

Anticipated End Time: 08/03/2017 9:00 pm

ServiceLink will experience an outage. The vendor suggests that the actual outage will last under 5 minutes.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/04/2017 8:30 am

Anticipated End Time: 08/04/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/04/2017 8:30 am

Anticipated End Time: 08/04/2017 10:30 am

Routine Software Updates, no anticipated impact

MiBackup, MiServer

Scheduled Maintenance

Start Time: 08/04/2017 10:00 am

Anticipated End Time: 08/04/2017 2:00 pm

The MiBackup service will be unavailable for backup/restore while servers are patched and rebooted.

Contact Center, Voice Services, Ann Arbor IP Contact Center

Scheduled Maintenance

Start Time: 08/05/2017 7:00 am

Anticipated End Time: 08/05/2017 4:00 pm

We will be moving select contact centers from cluster2 to cluster1 as part of server consolidation project resulting from the fact that two of our servers are approaching end of life hardware. After this maintenance, agents will need to...

LSADN Power Enhancements

Scheduled Maintenance

Start Time: 08/05/2017 11:00 pm

Anticipated End Time: 08/06/2017 5:00 am

Through proactive power management, network services at LSADN are not expected to be disrupted.

Upgrade MACC Data Center Firewall Software

Scheduled Maintenance

Start Time: 08/06/2017 6:00 am

Anticipated End Time: 08/06/2017 7:00 am

No outage is expected with this maintenance as network traffic and protection will fail over to the standby firewall during the maintenance.

Backbone, Routine Fiber Maintenance

Scheduled Maintenance

Start Time: 08/09/2017 5:00 am

Anticipated End Time: 08/09/2017 8:00 am

This work should have no impact on network services.

Student Administration Application Service

Scheduled Maintenance

Start Time: 08/09/2017 12:00 pm

Anticipated End Time: 08/11/2017 5:00 pm

CSSTRS9 will be down for a refresh of data from CSPROD. Users will be unable to access CSSTRS9 during the outage.

Enable traffic on the new 10G links to the IPS at SEB

Scheduled Maintenance

Start Time: 08/10/2017 5:00 am

Anticipated End Time: 08/10/2017 7:00 am

No network disruption is expected.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/10/2017 6:30 pm

Anticipated End Time: 08/10/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/10/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

ServiceLink

Scheduled Maintenance

Start Time: 08/10/2017 7:00 pm

Anticipated End Time: 08/10/2017 11:00 pm

Users will not be able to reliably access ServiceLink during the patching process.

MiWorkspace

Scheduled Maintenance

Start Time: 08/11/2017 8:30 am

Anticipated End Time: 08/11/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/11/2017 8:30 am

Anticipated End Time: 08/11/2017 10:30 am

Routine Software Updates, no anticipated impact

Data Center Services, Upgrade ASBDC Data Center Firewall Software

Scheduled Maintenance

Start Time: 08/12/2017 11:00 pm

Anticipated End Time: 08/13/2017 1:00 am

No outage is expected with this maintenance as network traffic and protection will fail over to the standby firewall during the maintenance. Expectation for support teams to regression test their systems on the network as they deem...

Financial Application Service, Human Resources Application Service, Identity and Access Management Application Services, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 08/12/2017 11:00 pm

Anticipated End Time: 08/13/2017 7:00 am

CSPROD will be down for a PeopleTools patch during the regular weekend maintenance window. No outage is expect outside of the normal maintenance window. Those connecting to CSPROD via RDA, API or other integration during the maintenance...

Backbone, r-BIN-ARBL - SCBE2/SF2 Installation - Attn: HITS Network

Scheduled Maintenance

Start Time: 08/13/2017 5:00 am

Anticipated End Time: 08/13/2017 7:00 am

Impact to internet traffic is 30 seconds.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/17/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/17/2017 6:30 pm

Anticipated End Time: 08/17/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/18/2017 8:30 am

Anticipated End Time: 08/18/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 08/18/2017 8:30 am

Anticipated End Time: 08/18/2017 10:30 am

Routine Software Updates, no anticipated impact

In-building Networks, Mosher Jordan

Scheduled Maintenance

Start Time: 08/19/2017 7:00 am

Anticipated End Time: 08/19/2017 3:30 pm

Purpose of Shutdown: To perform the 5 year preventative maintenance to the Substation. This maintenance is required to be performed every five years and will result in a total power outage

Voice Services, IP PBX - software upgrade (A2)

Scheduled Maintenance

Start Time: 08/19/2017 7:00 am

Anticipated End Time: 08/19/2017 4:00 pm

This maintenance will affect VoIP services in Ann Arbor only. Voice over IP (VoIP) services may be briefly interrupted at times due to maintenance being performed on the system. Some phone models will receive new firmware version and...

MiServer

Scheduled Maintenance

Start Time: 08/23/2017 9:00 am

Anticipated End Time: 08/28/2017 9:00 am

This is a note to inform you of upcoming quarterly maintenance for non-production managed Windows hosts. This launch of Windows quarterly maintenance will focus on agent updates, as opposed to security updates, which will continue to be...

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 08/23/2017 3:00 pm

Anticipated End Time: 08/23/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Data Center Services, LSA Room 0262

Scheduled Maintenance

Start Time: 08/24/2017 9:00 am

Anticipated End Time: 08/24/2017 11:00 am

None

MiWorkspace

Scheduled Maintenance

Start Time: 08/24/2017 6:00 pm

Anticipated End Time: 08/24/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/24/2017 6:30 pm

Anticipated End Time: 08/24/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/25/2017 8:30 am

Anticipated End Time: 08/25/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/25/2017 8:30 am

Anticipated End Time: 08/25/2017 10:30 am

Routine Software Updates, no anticipated impact

Upgrade Software on s-ASBDC-Y08-1 at ASB Data Center (ASBDC)

Scheduled Maintenance

Start Time: 08/26/2017 11:00 pm

Anticipated End Time: 08/27/2017 1:00 am

The expected outage for this maintenance is 30 minutes.

Campus Computing Sites

Scheduled Maintenance

Start Time: 08/31/2017 6:30 pm

Anticipated End Time: 08/31/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 08/31/2017 6:30 pm

Anticipated End Time: 08/31/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/01/2017 8:30 am

Anticipated End Time: 09/01/2017 10:30 am

Routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/01/2017 8:30 am

Anticipated End Time: 09/01/2017 10:30 am

Routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 09/07/2017 6:30 pm

Anticipated End Time: 09/07/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/07/2017 6:30 pm

Anticipated End Time: 09/07/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/14/2017 6:30 pm

Anticipated End Time: 09/14/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/14/2017 6:30 pm

Anticipated End Time: 09/14/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/21/2017 6:30 pm

Anticipated End Time: 09/21/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/21/2017 6:30 pm

Anticipated End Time: 09/21/2017 8:30 pm

routine software updates, no anticipated impacts

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 09/23/2017 11:00 pm

Anticipated End Time: 09/24/2017 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

Learning Management

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

During the CSPROD Bundle Release maintenance on October 7th (http://status.its.umich.edu/report.php?id=127640), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also be...

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

CSPROD will be down from 11:00pm on 10/07/17 through 7:00am on 10/08/17.

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/18/2017 12:00 pm

Anticipated End Time: 10/20/2017 5:00 pm

CSQA9 will be down for a refresh of data from CSPROD. Users will be unable to access CSQA9 during the outage.

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/27/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/26/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

Learning Management

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

Student Administration Application Service

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

CSPROD will be down from 11:00pm on 12/02/17 through 7:00am on 12/03/17.

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

During the CSPROD Bundle Release maintenance on December 2nd (http://status.its.umich.edu/report.php?id=127660), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also...

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 12/06/2017 3:00 pm

Anticipated End Time: 12/06/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

MiWorkspace

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 01/13/2018 11:00 pm

Anticipated End Time: 01/14/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 03/07/2018 3:00 pm

Anticipated End Time: 03/07/2018 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 04/07/2018 11:00 pm

Anticipated End Time: 04/08/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Analytics and BI, Financial Application Service, Human Resources Application Service, Identity and Access Management Application Services, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 05/17/2018 5:00 pm

Anticipated End Time: 05/21/2018 6:00 am

Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required to maintain compliance...

Financial Application Service, Human Resources Application Service, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 06/07/2018 5:00 pm

Anticipated End Time: 06/11/2018 6:00 am

Contingency Window: Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required...

Report Additional Impacts