Upcoming Maintenance RSS

Backbone

Scheduled Maintenance

Start Time: 09/26/2017 7:00 am

Anticipated End Time: 09/26/2017 8:00 am

We will be upgrading the software on UMVPN7 and UMVPN7-stby on Tuesday September 26th at 7:00 am

Backbone, r-SEB 100G Optic module Maintenance ( connecting r-MACC-d )

Emergency Maintenance

Start Time: 09/27/2017 5:00 am

Anticipated End Time: 09/27/2017 6:00 am

UMnet will be replacing a fiber optic transceiver on r-SEB as part of troubleshooting higher than average input errors between r-SEB & r-MACC-d

In-building Networks, UPS Replacement @ GG Brown BLDG-3rd Floor

Scheduled Maintenance

Start Time: 09/27/2017 5:30 am

Anticipated End Time: 09/27/2017 7:00 am

A failing UPS will be replaced @ GG Brown BLDG-3rd Floor on Wed Sep 27th between 05:30 and 07:00. Any potential outage will be less than 5 minutes during the above window.

In-building Networks, UPS Replacement @ INDUSTRIAL OPERATIONS ENG BLDG-2nd Floor

Scheduled Maintenance

Start Time: 09/28/2017 5:30 am

Anticipated End Time: 09/28/2017 7:00 am

A failing UPS will be replaced @ INDUSTRIAL OPERATIONS ENG BLDG-2nd Floor on Thu Sep 28th between 05:30 and 07:00. Any potential outage will be less than 5 minutes during the above window.

Backbone

Scheduled Maintenance

Start Time: 09/28/2017 6:00 am

Anticipated End Time: 09/28/2017 7:00 am

On Thursday September 28th we will be moving the inside interfaces of UMVPN1 and 2 to other interfaces on the same device. This is alleviate interface errors. During the maintenance while the interfaces are being moved the connected...

MiWorkspace

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/28/2017 6:30 pm

Anticipated End Time: 09/28/2017 8:30 pm

routine software updates, no anticipated impacts

In-building Networks, UPS Replacement @ GORGUZE LAB-2nd Floor

Scheduled Maintenance

Start Time: 09/29/2017 5:30 am

Anticipated End Time: 09/21/2017 7:00 am

A failing UPS will be replaced @ GORGUZE LAB-2nd Floor on Fri Sep 29th between 05:30 and 07:00. Any potential outage will be less than 5 minutes during the above window.

MiWorkspace

Scheduled Maintenance

Start Time: 09/29/2017 8:30 am

Anticipated End Time: 09/29/2017 10:30 am

Routine Software Update - No anticipated updates

Campus Computing Sites

Scheduled Maintenance

Start Time: 09/29/2017 8:30 am

Anticipated End Time: 09/29/2017 10:30 am

Routine Software Updates, no anticipated impacts

MiBackup, MiServer

Scheduled Maintenance

Start Time: 09/29/2017 10:00 am

Anticipated End Time: 09/29/2017 2:00 pm

Backup and restore functionality will not be available as servers are rebooted to apply OS patches.

Learning Management

Scheduled Maintenance

Start Time: 09/29/2017 5:00 pm

Anticipated End Time: Unknown

As part of consolidation of various Dearborn and the Ford School (umichfordschool.qualtrics.com) brands into the umich.qualtrics.com brand, the survey administration interface will not be available beginning Friday, April 29 at 5pm....

MiStorage NFS

Scheduled Maintenance

Start Time: 09/30/2017 11:00 pm

Anticipated End Time: 10/01/2017 7:00 am

Access to the shares being migrated will not be available while DNS is updated and the final data synchronization completes. It is recommended that users of these shares unmount them prior to the cutover window. A reboot may be required...

OpenShift Container Platform

Scheduled Maintenance

Start Time: 09/30/2017 11:00 pm

Anticipated End Time: 10/01/2017 2:00 am

No downtime is expected for applications running on the platform as running containers will be drained from impacted nodes to functional nodes while maintenance is being performed.

Development / Alumni Application Service

Scheduled Maintenance

Start Time: 09/30/2017 11:00 pm

Anticipated End Time: 10/01/2017 4:00 am

There should be no impact to users as the servers are load balanced. Each server will be pulled out of the load balancer and edited one at a time.

Financial Application Service, Human Resources Application Service, Imaging Service, Student Administration Application Service, Imagenow/WebNow

Scheduled Maintenance

Start Time: 09/30/2017 11:00 pm

Anticipated End Time: 10/01/2017 3:00 am

Users will not be able to view imaged docs while the maintenance is taking place.

Data Center Services, Arbor Lakes South

Scheduled Maintenance

Start Time: 09/30/2017 11:00 pm

Anticipated End Time: 10/01/2017 6:00 am

None

Development / Alumni Application Service

Scheduled Maintenance

Start Time: 09/30/2017 11:00 pm

Anticipated End Time: 10/01/2017 4:00 am

Users of the BBEC application may not be able to validate an address for a few seconds while the update is installed.

Data Center Services, Contingency Date: LSADN Power Maintenance Impacting Building Network

Scheduled Maintenance

Start Time: 09/30/2017 11:00 pm

Anticipated End Time: 10/01/2017 7:00 am

There will be an extended outage for the LSA building during the maintenance window. Network services to campus are not expected to be disrupted.

Internet, Security Essential Service, Conduct Intrusion Prevention System (IPS) Update

Scheduled Maintenance

Start Time: 10/01/2017 6:00 am

Anticipated End Time: 10/01/2017 8:00 am

This is a routine maintenance that will not impact internet or network traffic and will not interfere with IPS security functionality.

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/05/2017 6:30 pm

Anticipated End Time: 10/05/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/06/2017 8:30 am

Anticipated End Time: 10/06/2017 10:30 am

Routine Software Updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/06/2017 8:30 am

Anticipated End Time: 10/06/2017 10:30 am

Routine software updates, no anticipated impacts

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

During the CSPROD Bundle Release maintenance on October 7th (http://status.its.umich.edu/report.php?id=127640), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also be...

Learning Management

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/07/2017 11:00 pm

Anticipated End Time: 10/08/2017 7:00 am

CSPROD will be down from 11:00pm on 10/07/17 through 7:00am on 10/08/17.

MiServer

Scheduled Maintenance

Start Time: 10/11/2017 9:00 am

Anticipated End Time: 10/16/2017 9:00 am

Standard monthly security patches will be applied. Patching of all MiServer Managed Windows servers will take place during their regularly scheduled patch times. Please inform your customers about the upcoming reboots associated with this...

MiWorkspace

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/12/2017 6:30 pm

Anticipated End Time: 10/12/2017 8:30 pm

routine software updates, no anticipated impacts

Human Resources Application Service

Scheduled Maintenance

Start Time: 10/14/2017 11:00 pm

Anticipated End Time: 10/15/2017 12:00 am

The system may be unavailable briefly while DNS updates.

Data Center Services, Arbor Lakes South

Scheduled Maintenance

Start Time: 10/14/2017 11:00 pm

Anticipated End Time: 10/15/2017 6:00 am

None

Upgrade Uplinks on 2 MACC Storage Switches

Scheduled Maintenance

Start Time: 10/15/2017 5:00 am

Anticipated End Time: 10/15/2017 7:00 am

Minimum disruptions will occur due to spanning-tree protocol re-convergence; 2 disruptions (30 sec each) when the primary uplink for each switch is converted to 40G.

Data Center Services, Install 40Gb Line Cards at MACC

Scheduled Maintenance

Start Time: 10/15/2017 6:00 am

Anticipated End Time: 10/15/2017 7:00 am

No network disruption, or impact to services, is expected with this maintenance.

Human Resources Application Service

Scheduled Maintenance

Start Time: 10/16/2017 8:00 am

Anticipated End Time: 10/17/2017 12:00 pm

HCMQA92 will be down for a refresh of data from HCMPROD. Users will be unable to access HCMQA92 during the outage.

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/18/2017 12:00 pm

Anticipated End Time: 10/20/2017 5:00 pm

CSQA9 will be down for a refresh of data from CSPROD. Users will be unable to access CSQA9 during the outage.

MiWorkspace

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/19/2017 6:30 pm

Anticipated End Time: 10/19/2017 8:30 pm

routine software updates, no anticipated impacts

Student Administration Application Service

Scheduled Maintenance

Start Time: 10/21/2017 11:00 pm

Anticipated End Time: 10/22/2017 12:00 am

Users will not be able to access the system until the web services are available on the F5 load balancer.

Campus Computing Sites

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/26/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 10/26/2017 6:30 pm

Anticipated End Time: 10/27/2017 8:30 pm

routine software updates, no anticipated impacts

Financial Application Service

Scheduled Maintenance

Start Time: 10/28/2017 11:00 pm

Anticipated End Time: 10/29/2017 12:00 am

The system may be unavailable briefly while DNS updates.

MiWorkspace

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/02/2017 6:30 pm

Anticipated End Time: 11/02/2017 8:30 pm

routine software updates, no anticipated impacts

MiWorkspace

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/09/2017 6:30 pm

Anticipated End Time: 11/09/2017 8:30 pm

routine software updates, no anticipated impacts

Human Resources Application Service

Scheduled Maintenance

Start Time: 11/11/2017 11:00 pm

Anticipated End Time: 11/12/2017 7:00 am

HCMPROD will be applying the October PeopleTools security patch. This will require an outage during the maintenance window while the patch is applied.

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/16/2017 6:30 pm

Anticipated End Time: 11/16/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/23/2017 6:30 pm

Anticipated End Time: 11/23/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 11/30/2017 6:30 pm

Anticipated End Time: 11/30/2017 8:30 pm

routine Software Updates, no anticipated impact

Student Administration Application Service

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

CSPROD will be down from 11:00pm on 12/02/17 through 7:00am on 12/03/17.

Sponsor System, Sponsor System web service, MCommunity connector to CSPROD

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

During the CSPROD Bundle Release maintenance on December 2nd (http://status.its.umich.edu/report.php?id=127660), the Sponsor System will be unavailable. This includes the web service. The connector between MCommunity and CSPROD will also...

Learning Management

Scheduled Maintenance

Start Time: 12/02/2017 11:00 pm

Anticipated End Time: 12/03/2017 7:00 am

Dash will not populate its data during the CSPROD maintenance occurring at this time.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 12/06/2017 3:00 pm

Anticipated End Time: 12/06/2017 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

MiWorkspace

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/07/2017 6:30 pm

Anticipated End Time: 12/07/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/14/2017 6:30 pm

Anticipated End Time: 12/14/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/21/2017 6:30 pm

Anticipated End Time: 12/21/2017 8:30 pm

routine Software Updates, no anticipated impact

Campus Computing Sites

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

MiWorkspace

Scheduled Maintenance

Start Time: 12/28/2017 6:30 pm

Anticipated End Time: 12/28/2017 8:30 pm

routine Software Updates, no anticipated impact

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 01/13/2018 11:00 pm

Anticipated End Time: 01/14/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

MiServer, No user-facing services

Scheduled Maintenance

Start Time: 03/07/2018 3:00 pm

Anticipated End Time: 03/07/2018 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 04/07/2018 11:00 pm

Anticipated End Time: 04/08/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

Analytics and BI, Financial Application Service, Human Resources Application Service, Identity and Access Management Application Services, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 05/17/2018 5:00 pm

Anticipated End Time: 05/21/2018 6:00 am

Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required to maintain compliance...

Financial Application Service, Human Resources Application Service, Imaging Service, Learning Management, Mobile Applications, Student Administration Application Service

Scheduled Maintenance

Start Time: 06/07/2018 5:00 pm

Anticipated End Time: 06/11/2018 6:00 am

Contingency Window: Upgrade the M-Pathways Student Administration application from Campus Solutions version 9.0 to 9.2. Upgrade the underlying infrastructure???s operating system from Linux RHEL6 to RHEL7. This upgrade is required...

MiStorage CIFS, No user-facing services

Scheduled Maintenance

Start Time: 06/13/2018 3:00 pm

Anticipated End Time: 06/13/2018 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 07/14/2018 11:00 pm

Anticipated End Time: 07/15/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.

MiStorage CIFS, No user-facing services

Scheduled Maintenance

Start Time: 09/12/2018 3:00 pm

Anticipated End Time: 09/12/2018 6:00 pm

Systems Support will be patching and rebooting all non-prod Linux servers. Individual teams are being notified via contact information in their purpose files. All Non-Prod PeopleSoft systems : HCM, CS, FIN Non-Prod systems including...

Development / Alumni Application Service, Financial Application Service, Human Resources Application Service, MiBackup, MiDatabase, MiServer, My SQL Database Hosting, Statistics and Computation, Student Administration Application Service, Web Application Hosting

Scheduled Maintenance

Start Time: 10/13/2018 11:00 pm

Anticipated End Time: 10/14/2018 3:00 am

Systems Support will be patching and rebooting all production Linux servers. Individual teams will be notified via contact info in purpose files. If exceptions are needed, please request them in response to that email.